Location: Erbil, Iraq Scope of Work: Supply and installation of complete electrical substation Installation of 2 power transformers (1600 kVA, 11kV) Supply and installation of switchgear system Installation of 2 generators (1100 kVA & 550 kVA) Implementation of synchronization system. This project was delivered in accordance with advanced engineering standards to ensure system stability, operational […]
Zerin city in kalar Project
Design & implementation of 3 MW power plant. Delivering ofand installation ( 1x150mm²/25,Cu/XLPE/Cu screen) of 12.7-22 kV armoure cable ,MDPE,Single Core Cables, , according to the Ministry of Electricity specification. (3) kiosks, each rated at 1250 kVA, stepping down from11 kV to 0.4 kV.
Dalal City residential project
Design and implementation of the electrical infrastructure project for the residential development of Dalal City. The project consists of: (3) kiosks, each rated at 1250 kVA, stepping down from11 kV to 0.4 kV. A main power station including a 11 kV switchgear system rated at 630 A. Three (2) generators, each with a capacity of […]
Project, Halabja
Design and implementation of the electrical infrastructure project for the residential development of SHARAZWR City The project consists of: (2) kiosks, each rated at 1000 kVA, stepping down from11 kV to 0.4 kV. A main power station including a 11 kV switchgear system rated at 630 A. Supply manpower and delivering Power cables with below […]